Interiors were updated to include modern, yet affordable fixtures and finishes that nod to Olin’s past and Spanish Mission design. All unit interiors, bathrooms, and kitchens were revised, and windows were replaced. A stair and lift were added for access to the 5th floor. Adding a gym and lounge space with a fireplace, the game room, dining hall, and dance floor were all updated. Incorporating security upgrades and common areas that look out to the street created a better connection between residents and the neighborhood, fostering a safer streetscape.
WORKSHOP8 provided architecture, interior design, environmental graphic design, and contract administration in-house. Subconsultants included: civil, landscape, MEP, energy and structural engineering.