PROJECT DATES

Nov 2019 to January 2023

PROJECT DESCRIPTION

This multi-building project wasn't a mere makeover, it was a metamorphosis! We transformed 42 units across three buildings: two 2-story residences, a one-story building, and a charming historic circular community hub – the heart of the complex – boasting offices, laundry, and a welcoming gathering space. Each building received a distinctive color palette and brick accents that harmonized with the round house, while stylish awnings added a touch of pizzazz.

Upgrades went beyond aesthetics. We improved the parking lot, lighting, trash areas, signage, and landscaping, even adding carports. Inside the residences, new floors, doors, counters, and refrigerators modernized the living spaces. Safety features included replaced entryway roofs and grab bars in showers. Four units became fully accessible, and the entire site received an ADA compliance upgrade. The round house gained a new lift, upgraded HVAC, and ADA-compliant restrooms and kitchen. Today, the revitalized complex seamlessly blends history, comfort, and inclusivity for all residents.

SCOPE OF WORK

Site Work: parking lot upgrades, site lighting, new trash enclosures, updated monument signage, updated landscaping, adding carports

Resident Buildings: exterior and interior renovation, unit flooring, interior and exterior doors, kitchen counters and refrigerators, replacement of entryway roofs, installation of grab bars in showers, and converting four units to “fully accessible” with an overall site survey for ADA compliance

Round House: addition of an elevator, HVAC replacement, reconfiguring restrooms and kitchen for ADA compliance

SERVICES PROVIDED

WORKSHOP8 provided architecture, interior design, FF&E, branding, signage design, art design and selection, and contract administration in-house. Subconsultants included: civil, landscape, MEP and structural engineering.

PROJECT TEAM

Architect Principal | Joseph Vigil
Project Architect | Marcel van Garderen
Creative Director | Brandy LeMae
Interior Design Manager | Chelsea Semelka

General Contractor | Taylor Kohrs
MEP Engineer | Given and Associates
Civil Engineer | Proof Civil
Structural Engineer | LT Engineering
Landscape Architect | Lime Green Design

SIZE

42 Units / 31,288 SF

POPULATIONS SERVED

Elderly and Disabled / 100% Affordable

FUNDING

4 % LIHTC

SUSTAINABILITY

2015 Enterprise Green Communities

SAFE HARBORS

ADA > 2017 ICC A117.1 / UFAS

CONSTRUCTION COST

$3,700,000